Road Reconstruction and Upgrade - Gulf Parade Maslin Beach

Share on Facebook Share on Twitter Share on Linkedin Email this link


We are pleased to advise that we are planning a road reconstruction and upgrade along the section of Gulf Parade, Maslin Beach between Old Coach Road and Seaview Road in late 2021.


The work aims to widen the road, reduce speeding, improve drainage, provide further safety for pedestrians and motorists and beautify this gateway to Maslin Beach.




WORK WILL CONSIST OF:

  • Replacing the old road pavement.
  • Increase the road width to 3.3m wide traffic lanes and 2.1m wide parking lanes on the residential side.
  • Installing pedestrian crossings with refuges.
  • Installing new upright kerbs and gutters.
  • Introducing traffic calming treatments and protuberances.
  • Upgrading and installing additional stormwater drainage infrastructure.
  • Planting native trees and landscaping.
  • Upgrading street lighting where required.


View the Concept Plan for more information.


HAVE YOUR SAY

Consultation closed on Monday 14 December 2020.


We are pleased to advise that we are planning a road reconstruction and upgrade along the section of Gulf Parade, Maslin Beach between Old Coach Road and Seaview Road in late 2021.


The work aims to widen the road, reduce speeding, improve drainage, provide further safety for pedestrians and motorists and beautify this gateway to Maslin Beach.




WORK WILL CONSIST OF:

  • Replacing the old road pavement.
  • Increase the road width to 3.3m wide traffic lanes and 2.1m wide parking lanes on the residential side.
  • Installing pedestrian crossings with refuges.
  • Installing new upright kerbs and gutters.
  • Introducing traffic calming treatments and protuberances.
  • Upgrading and installing additional stormwater drainage infrastructure.
  • Planting native trees and landscaping.
  • Upgrading street lighting where required.


View the Concept Plan for more information.


HAVE YOUR SAY

Consultation closed on Monday 14 December 2020.