Roy Terrace Christies Beach Road - Road, Drainage and Footpath Reconstruction

Share on Facebook Share on Twitter Share on Linkedin Email this link



We're planning an upgrade for Roy Terrace, Christies Beach.

The project aims to reduce speeding issues, improve storm water runoff, provide further safety for pedestrians and motorists and improve the streetscape.

Construction is scheduled for the 2021/22 financial year.

View the Concept Plan.


Construction is scheduled for 2021 and will consist of:

  • Replacing the existing road seal
  • Constructing new solid kerb protuberances
  • Re-configuring existing line marking
  • Replacing damaged segments of existing kerb and gutter
  • Replacing existing stormwater pits and kerb ramps where required
  • Constructing a new footpath along the western side of Roy Terrace between Beach Road and Gulfview Road
  • Replacing damaged sections of footpath and realigning where required along the eastern side of Roy Terrace
  • Reinstating/relocating the existing bus stops to current standards and to suit the proposed new road geometry
  • Reinstatement of all affected residential driveways and verges upon completion of the works using similar materials to existing
  • Introducing new street trees where possible


HAVE YOUR SAY

Consultation closed on 23 November 2020.

Thanks to everyone who provided feedback.

We are still working closely with those most impacted and will round back to the community once the concept plan is complete.




We're planning an upgrade for Roy Terrace, Christies Beach.

The project aims to reduce speeding issues, improve storm water runoff, provide further safety for pedestrians and motorists and improve the streetscape.

Construction is scheduled for the 2021/22 financial year.

View the Concept Plan.


Construction is scheduled for 2021 and will consist of:

  • Replacing the existing road seal
  • Constructing new solid kerb protuberances
  • Re-configuring existing line marking
  • Replacing damaged segments of existing kerb and gutter
  • Replacing existing stormwater pits and kerb ramps where required
  • Constructing a new footpath along the western side of Roy Terrace between Beach Road and Gulfview Road
  • Replacing damaged sections of footpath and realigning where required along the eastern side of Roy Terrace
  • Reinstating/relocating the existing bus stops to current standards and to suit the proposed new road geometry
  • Reinstatement of all affected residential driveways and verges upon completion of the works using similar materials to existing
  • Introducing new street trees where possible


HAVE YOUR SAY

Consultation closed on 23 November 2020.

Thanks to everyone who provided feedback.

We are still working closely with those most impacted and will round back to the community once the concept plan is complete.


Have a question about this project?

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.