Myerhoff Park Playground Upgrade

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

Work commencing mid-April with estimated completion by the end of May 2020

The existing playground and irrigation system at Myerhoff Park, Aldinga Beach requires replacement. The design includes new playground equipment, new seating and an upgrade of the irrigation system.

Community consultation was conducted in November 2019. The feedback received demonstrated local community support for the draft concept plan however there was a strong response requesting the inclusion of some play items tailored to older children.

We have reflected the community’s needs and initiated changes to the design by swapping the 3-way seesaw (suitable for 3-8 year olds) to a box climber (suitable for 6-12 year olds). The revised concept plan is available for viewing in the document library (right hand side of this page).

Work is scheduled for completion by the end of May 2020.

Further updates will be shared here and Advance Notice signs will be in place prior to construction.


Work commencing mid-April with estimated completion by the end of May 2020

The existing playground and irrigation system at Myerhoff Park, Aldinga Beach requires replacement. The design includes new playground equipment, new seating and an upgrade of the irrigation system.

Community consultation was conducted in November 2019. The feedback received demonstrated local community support for the draft concept plan however there was a strong response requesting the inclusion of some play items tailored to older children.

We have reflected the community’s needs and initiated changes to the design by swapping the 3-way seesaw (suitable for 3-8 year olds) to a box climber (suitable for 6-12 year olds). The revised concept plan is available for viewing in the document library (right hand side of this page).

Work is scheduled for completion by the end of May 2020.

Further updates will be shared here and Advance Notice signs will be in place prior to construction.


  • We'd love to hear what you think about the proposed upgrade. Please leave your feedback here. 

    We'd love to hear what you think about the proposed upgrade. Please leave your feedback here. 

    Consultation has concluded
    Share on Facebook Share on Twitter Share on Linkedin Email this link